General contracting is the work of holding a multi-trade project together: deciding the sequence, keeping the trades from tripping over each other, catching what turns up once things are open, and giving you one person to ask instead of five.
Most homeowners do not set out to hire a general contractor. They set out to fix one thing, discover it is attached to three other things, and find themselves trying to get a roofer, a drywall finisher, and a painter to agree on a calendar.
That coordination is a real job. It is the one we do.
What a general contractor actually does
- Decides the order. Most of the cost of a badly run job is rework: the floor that went in before the drywall dust, the paint that went on before the leak was found. The sequence is the product.
- Holds one scope. One written description of the whole job, rather than four quotes that each assume somebody else is handling the awkward part.
- Owns the junctions. The places where one trade hands off to another are where things get missed, because they belong to neither one.
- Handles what turns up. Something always does. What matters is that you hear it when it is found, with what it means, rather than at the end.
- Answers the phone. One number, one person who knows what is happening on your property this week.
When you need one, and when you do not
If the job is one trade and one room, you do not need a general contractor, and we will tell you that. Call the trade directly.
It is worth having one when the work crosses trades, when the order matters, when one part cannot be scoped until another is opened, or when a permit and its inspections have to be threaded through the schedule. The test is not the size of the job. It is the number of things that have to happen in the right order.
The general contracting work we take on
- Multi-trade property work, where the coordination is the difficult part.
- Repairs after water damage, which start on the roof and end in a painted ceiling and usually cross four trades in between.
- Property repairs, including the smaller items that keep a house sound and keep getting postponed.
- Rental turnovers and vacant-property care, run as one coordinated scope. More about make-ready and property preservation.
- Work that turned out to be bigger than it looked, which is most of it.
The services this pulls together
- Roofing: repair, replacement, and storm damage work.
- Remodeling: kitchens, bathrooms, and reworking rooms that do not work.
- Home additions: new space, and the junction where it meets the existing house.
- Flooring: the subfloor first, then the floor.
- Drywall: repair, replacement, finishing, and texture.
- Painting: interior and exterior, preparation first.
How the work is run
We look at the property. We tell you what we found, including the parts that cannot be known until something is open. You get the scope in writing, with the sequence in it, so you can read it, question it, or take it to someone else for a second opinion. If a permit applies, you hear that before the work starts rather than after, and the requirements get confirmed with the authority for your jurisdiction rather than assumed from the mailing address.
Then the work gets done in the agreed order, you hear about anything that turns up at the point we find it, and the site gets cleared when we are finished. The company email is what it is because clearing up afterward is part of the job rather than an extra.